1、運抵(di)調試現場后(hou),用合適噸位吊車將污水處理(li)設備(bei)吊放到調試指定(ding)位置,設備(bei)擺放方向不能放錯相(xiang)互之間距必須準確,以便(bian)于(yu)后(hou)續工(gong)作的進行(xing).
2、外部污水管路、電路、橋(qiao)架(jia)安裝
3、設備就位后(hou)開始外部管路安(an)裝、電路連接、橋架安(an)裝。
4、外部各管(guan)路連(lian)(lian)接(jie)(jie)(jie)接(jie)(jie)(jie)口要無(wu)油污,用砂紙將連(lian)(lian)接(jie)(jie)(jie)口打磨并(bing)涂上(shang)一層膠(jiao)水(shui)或墊橡膠(jiao)墊,待(dai)膠(jiao)水(shui)層稍(shao)干后在(zai)進行管(guan)路連(lian)(lian)接(jie)(jie)(jie),要求連(lian)(lian)接(jie)(jie)(jie)管(guan)路處不(bu)能(neng)滲(shen)漏。
5、電(dian)(dian)(dian)控(kong)柜擺放在主體(ti)設(she)備側邊,外部電(dian)(dian)(dian)路把電(dian)(dian)(dian)控(kong)制柜控(kong)制線(xian)、污(wu)(wu)水設(she)備連線(xian)、電(dian)(dian)(dian)控(kong)柜與電(dian)(dian)(dian)源(yuan)接通(tong),電(dian)(dian)(dian)源(yuan)線(xian)與污(wu)(wu)水設(she)備接線(xian)時注意(yi)污(wu)(wu)水設(she)備間(jian)風機、電(dian)(dian)(dian)機的轉(zhuan)向(xiang)。
6、在設備布線(xian)時,要把設備之(zhi)間應安裝的橋架固定完畢,為接電源線(xian)走線(xian)做準備。
7、內(nei)部電路(lu)、管(guan)路(lu)連接(jie)
8、內(nei)部(bu)電路、管路連(lian)接(jie)必須(xu)嚴(yan)格按(an)照生產廠家所提供的內(nei)部(bu)電、管路布線圖(tu)(tu)連(lian)接(jie)(詳見(jian)設備內(nei)部(bu)電、管路布置圖(tu)(tu))。